三九宝宝网宝宝百科宝宝知识

商业计算机物料需求计划

11月05日 编辑 39baobao.com

[儿童的心理需求]现在的父母,常常为了儿童的身体的发育,竭尽所能为儿童补充大量的营养品,以期他们有一个健康的体魄。然而,有些父母往往忽略了儿童在其心理的成长过程中也需要补充一些“心理营养...+阅读

Material Requirements Planning

Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.

An MRP system is intended to simultaneously meet three objectives: Ensure materials and products are ailable for production and delivery to customers. Maintain the lowest possible level of inventory. Plan manufacturing activities, delivery schedules and purchasing activities.

The scope of MRP in manufacturing

All manufacturing anisations, whatever it is they produce, face the same daily practical problem - Customers want products to be ailable in a shorter time than it takes to make them. This means that some level of planning is required.

panies need to control the types and quantities of materials they purchase, plan which products are to be produced and in what quantities and ensure that they are able to meet current and future customer demand, all at the lowest possible cost. Making a bad decision in any of these areas will lose the pany money. A few examples are given below: If a pany purchases insufficient quantities of an item used in manufacturing, or the wrong item, they may be unable to meet contracts to supply products by the agreed date. If a pany purchases excessive quantities of an item, money is being wasted - the excess quantity ties up cash while it remains as stock and may never even be used at all. This is a particularly severe problem for food manufacturers and panies with very short product life cycles. Beginning production of an order at the wrong time can mean customer deadlines being missed.

MRP is used by many anisations as a tool to deal with these problems. The questions it provides answers for are: WHAT items are required, HOW MANY are required and WHEN are they required by. This applies to items that are bought in and to sub-assemblies that go into more plex items.

Inputs and outputs

Running a report from MRP begins with an estimate of what products will be required in the next time period (an arbitrary length of time, often but not always one week), taken from the master production schedule. The MRP software calculates the times required to manufacture the products, using the factory's estimated time to assemble each product. Then, the system explodes the product into lists of parts required, assim using the bills of materials developed by the engineering department. The parts are ordered at times back-dated (or "offset") from the dates of assembly and the relevant paperwork is generated.

This system works through what are termed inputs and outputs. The inputs are entered into the software, which uses them for processing the outputs. The inputs and outputs essential to an MRP system are as follows:

Inputs Master production schedule. This is a bination of all the known and expected DEMAND for the products being created. The MPS spans a PLANNING HORIZON that includes the present and extends several months, and sometimes even years, into the future. The MPS ONLY addresses the END ITEMS being produced. The ponent levels will be addressed by the MRP system. This is sometimes referred to as "A production plan for all products". The MPS provides knowledge of DEMAND in these three details: The END ITEM(s) being created (a.k.a. Independent Demand, Level "O" on BOM) How much is required at a time When the quantity(s) are required to meet demand Inventory status records. Records of materials AVAILABLE for use already in stock (on hand) and materials on order from suppliers. Bills of materials. Details of the materials, ponents and subassemblies required to make each product. Planning Data. This incl

udes all the restraints and directions to produce the end items. This includes such items as: Routings, Labor and Machine Standards, Pull/Work Cell and Push mands, Lot sizing technique(s) (i.e. Fixed Lot Size, Lot-For-Lot, Economic Order Quantity), Scrap Percentages, and other inputs.

Outputs

There are only two (2) outputs and a variety of messages/reports Output 1 is the "Remended Production Schedule" which lays out a detailed schedule of the required minimum start and pletion pletion dates, with quantities, for each step of the Routing and Bill Of Material required to satisfy the demand from the MPS Output 2 is the "Remended Purchasing Schedule". This lays out the dates that the purchased items should be both received into the facility AND the date(s) the Purchase Orders, or Blanket Order Release should occur to match the production schedules.

Messages and Reports: Purchase orders. An order to a supplier to provide materials. Reschedule notices. These REMEND cancel, increase, delay or speed up existing orders.

Note that the OUTPUTS are REMENDED. Due to a variety of changing conditions in panys, since the last MRP / ERP system Re-Generation, the remended outputs need to be reviewed by TRAINED people to group orders for benefits in set-up or freight sings. These actions are beyond the linear calculations of the MRP puter software.

MRP/ERP Systems were first introduced by Gee Plossl and John Orlicky in the late 1960s. Oliver Wight contributed the evolution to MRP2, to include more than the factory production and material needs. ERP evolved with the change in hardware / software capability and "Interface" interpretations between software.

Problems with MRP systems

The major problem with MRP systems is the integrity of the data. If there are errors in the inventory data, the bill of material data or the master production shedule then the output will also be incorrect. Most vendors of this type of system reend at least 98% data integrity for the system to give useful results.

Another major problem with MRP systems is the requirement that the user specify how long it will take a factory to make a product from it's ponent parts (assuming they are all ailable). Additionally, the system design also assumes that this "lead time" in manufacturing will be the same each time the item is made, without regard to quantity being made, or other items being made simultaneously in the factory.

MRP also tends to want to aggregate several different demands for an item occuring at the same or closely spaced time intervals into a single replenishment activity, thereby either delaying ailability of items early on (if the batch is not pleted until the date of the latest requirement), or making excess inventory (the later demand is made too soon, resulting in unused inventory that must be warehoused for a period of time).

This means that other systems in the enterprise need to work properly before implementing an MRP system. For example systems to control changes to the parts used to make a product must be in place. Parts must be booked into and out of stores more regularly than the MRP calculations take place. Note, these other systems can well be manual systems, but must interface to the MRP. For example, a 'walk around' stocktake done just prior to the MRP calculations can be a practical solution for a small inventory. (especially if it is an "open store".)

The other major drawback of MRP is that takes no account of capacity in its calculations. This means it will give results that are impossible to implement due to manpower or machine or suppler capacity constraints. However this is largely dealt with by MRP2 II.

以下为关联文档:

需求宝宝不等于难缠宝宝,别嫌他烦,未来可能给你大惊喜!OK比较小的时候,我经常和邻居Cici一起“溜娃”。Cici的女儿属于那种特别“难带”的宝宝,比如开车一起出门玩,同样都是坐在后排坐位上,OK可以坐着看看窗外,烦燥了丢给他一个小玩具...

中班9月保育日记——尊重孩子的需求中午吃完午餐回教室,看到还有好多孩子没有吃好,我便鼓励他们把饭菜汤都吃掉!锐锐看着我,说: 嬷嬷,这个菜我不要吃! 我笑着对他说: 好孩子是不挑食的! 在我的一再鼓励下,锐锐把饭菜汤都...

2019年姓李男宝宝名字不同需求字义不同满分篇[李浚哲]100字义分析:浚,多音字,人名中多读jùn,是疏通之义;哲,指有才能的人,也可专指聪明,名字字义优美。打分理由:名字李浚哲的五行搭配为火-水-火,具有这种搭配的人性格通...

别忽视了孩子内心的需求小朋友们吃完点心陆陆续续地搬着小椅子坐下来看书。今天我请小朋友们阅读 安全教育 小课本。他们很喜欢,都挺安静地在看书,过了一会儿,我请看好的小朋友将书送回来。一个两个。...

妈妈挑选护肤品得根据妈妈皮肤需求我妈是令人超羡慕的的中性皮肤,不干不油,不黑也没有斑,天生白里透红,据说从小到现在没长过一颗痘痘是天生好皮肤星人 我没遗传到,所以常常羡慕的咬牙切齿在我还不太懂护肤的时...

周岁前宝宝的心理需求年轻的父母因为没有育儿的经验,在照顾宝宝时,一心只想着如何给宝宝最好的物质,让宝宝补充各种营养,帮助宝宝健康成长,却忽略了宝宝同样重要的心理需求。结果是花了很多金钱买了好...

绕开表面,了解孩子的深层需求绕开表面,了解孩子的深层需求二宝出生后,我一直和二宝同床,床不够大,只能把大宝安排在婴儿床上,现在二宝两岁了,日子过得平静滋润。不知什么时候开始,大宝在小床上开始不安分起来...

给有特殊需求的父母一些帮助  虽然现在的医学技术都很高明了,但是很多的有先天不足的孩子也同样会降临到这个世上,其实最痛苦的应该是这些孩子的父母了。对于他们来说,生活是很困难的,但是他们又不愿意让...

唤醒孩子心灵深处向真、向善、向美的欲望和需求一定要发展学生的个性与人性,坚信人性的力量,坚信所有现在活着的人心灵深处都有向真、向善、向美的欲望和需求 这是铁的法则。 魏书生 看到魏老师的这段话时,我心里总有一份...

推荐阅读
图文推荐